01/08/2013
Jump to navigation
Jump to search
Contents
First time Visitor Info
- PARK ONLY IN THE ORI LOT OR ON THE STREET
- If you park in our neighbors private lot, they will block you in for fun.
- Waivers of Liability - Please sign if you have not already
- Our website / calendar is http://www.lvl1.org
- Sign up for our Google Group discussion list
- You can find all of our Meeting Minutes at http://wiki.lvl1.org
Equipment and Supplies Wanted
- (Gerrit) Roomba parts for building the cleaning robot army.
- (Ron - Muddy Tech) Computers P4 or higher and LCD Monitors
- (John) 10hp Engine vertical shaft
- (Gerrit) Punching Bag for training the cleaning robot army
- (Ben) 220 30amp switch for stick welder
- (Devin)1366x768 monitor and low profile graphics card PCI-E
- (Devin) Gas weed trimmer(on shelf)
- (Ian) smoke machine(on shelf)
- (Tim M) full size dishwasher (for the kitchen)
- (Gerrit) additional copies HALO 1, 2 and Reach
- (Cody) Red Flyer Wagon
Space Upgrades
- New nozzle and new spool of black filament for Replicators
- New chuck installed in drill press
- Gaylords picked up
Space Downgrades
- Laser cutter motor controller exploded (UPDATE: Damaged board sent off to Full Spectrum for Repair 1/3)
Regular Meetups
- Sound Builders (fortnightly Mondays, next 1/21 8pm)
- LVL1 Open Meeting & Making every (Tuesday 8pm)
- Muddytech Computer training (upstairs Thurs 6pm) Looking for students
- Muddytech SIG every 3rd Wednesday
- Game Dev Group (Sat 12pm)
- KYOSS Monthly Meeting (2nd Wed of the Month 1/9 6:30pm)
- Friday Irregular Movie and Open Build Night (Friday if someone shows up ~7pm)
Upcoming Workshops and Events
- Officer and Director Election (1/15)
- Last day of nominations is 1/8
- Current nominations
- President - Brad L, ???
- Vice President - Josh W, ??? (Jose declined)
- Treasurer - Tim M, ???
- Secretary - Aaron V, ???
- Directors-at-Large - Raj S, Nathan A, Jose C, ??? (Need 3)
- Email secretary@lvl1.org with your votes to make it official
- Interest Check: 3D Printer Workshop in March (Prusa Mendel, $950)
- Need 3-4 more sign ups before the workshop can go off!
- Start-Up Weekend Louisville (March 1-3)
5 Minute Maintenance and Cleaning
- List on the whiteboard
- Move stuff from the donation shelf downstairs