01/08/2013

From LVL1
Jump to navigation Jump to search

First time Visitor Info

Equipment and Supplies Wanted

  • (Gerrit) Roomba parts for building the cleaning robot army.
  • (Ron - Muddy Tech) Computers P4 or higher and LCD Monitors
  • (John) 10hp Engine vertical shaft
  • (Gerrit) Punching Bag for training the cleaning robot army
  • (Ben) 220 30amp switch for stick welder
  • (Ian) smoke machine(on shelf)
  • (Tim M) full size dishwasher (for the kitchen)
  • (Cody) Red Flyer Wagon
  • (Devin)original NES connector
  • (Eric [Makership]) Laser distance sensors
  • (Lindsay [Makership]) Pinball Machine (any condition, will be redesigned)

Funds Allocation Petitions

  • 2 camera FAPs outstanding. Members, if you want a new Oculus camera, please +1 at least one of these.

Space Upgrades

  • New nozzle and new spool of black filament for Replicators
  • New chuck installed in drill press
  • Gaylords picked up
  • LVL1 Cards are in

Space Downgrades

  • Laser cutter motor controller exploded (UPDATE: Damaged board sent off to Full Spectrum for Repair 1/3)

Regular Meetups

  • Sound Builders (fortnightly Mondays, next 1/21 8pm)
  • LVL1 Open Meeting & Making every (Tuesday 8pm)
  • Muddytech Computer training (upstairs Thurs 6pm) Looking for students
  • Muddytech SIG every 3rd Wednesday
  • Game Dev Group (Sat 12pm)
  • KYOSS Monthly Meeting (2nd Wed of the Month 1/9 6:30pm)
  • Friday Irregular Movie and Open Build Night (Friday if someone shows up ~7pm)

Upcoming Workshops and Events

  • Officer and Director Election (1/15)
    • Last day of nominations is 1/8
    • Current nominations
      • President - Brad L, ???
      • Vice President - Josh W, ??? (Jose declined)
      • Treasurer - Tim M, ???
      • Secretary - Aaron V, ???
      • Directors-at-Large - Raj S, Nathan A, Jose C, ??? (Need 3)
    • Members: Email (Vote by proxy) secretary@lvl1.org with your votes to make it official (Deadline 1/14 8pm)
  • Interest Check: 3D Printer Workshop in March (Prusa Mendel, $950)
    • Need 3-4 more sign ups before the workshop can go off!
  • Start-Up Weekend Louisville (March 1-3)

5 Minute Maintenance and Cleaning

  • List on the whiteboard
  • Move stuff from the donation shelf downstairs

Project Roll Call