Difference between revisions of "03/13/2012"

From LVL1
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
#Please Sign in on the meeting attendance roster.
 
#Please Sign in on the meeting attendance roster.
 
#Waivers of Liability - Please sign if you have not already
 
#Waivers of Liability - Please sign if you have not already
#Old Business
+
#Equipment Wanted
##Equipment Wanted
+
##(Wiez)Crucible and investment (> 3000 deg)
###Crucible and investment (> 3000 deg)
+
##(Wiez)propane tank and regulator (old grill anyone?) and atmospheric air tank
###propane and atmospheric air
+
##(Josh?)Vacuum Pump CFM rating currently undecided.  
###Vacuum Pump CFM rating currently undecided.  
+
##(Tim/Space)Additional welding masks and welding screens
###Additional welding masks and welding screens
+
##(Wiez)Graphite sheet 1/8" - 1/4"in (or woven fiberglass / silicon)
###Graphite sheet 1/8" - 1/4"in (or woven fiberglass / silicon)
+
##(Chris/Brad)Solenoid Valve (>= 150psi)
###Solenoid Valve (>= 150psi)
+
#Open Invitations for LVL1 Contributions (for serious considerations, please put it in writing)
##Open Invitations for LVL1 Contributions (for serious considerations, please put it in writing)
+
##Bernheim CONNECT August 2012 Projects / Planning
###Bernheim CONNECT August 2012 Projects / Planning
+
##Projects / Installations for Louisville Metro
###Projects / Installations for Louisville Metro
+
##ConGlomeration (4/13-4/15)  would like to know if LVL1 would like run a panel this year
###ConGlomeration (4/13-4/15)  would like to know if LVL1 would like run a panel this year
+
###See Joe P if you are interested.
####See Joe P if you are interested.
+
##Meet Your Maker Series in the Louisville Paper (email Grace S.)
###Meet Your Maker Series in the Louisville Paper (email Grace S.)
+
#Space Upgrades
#New Business
+
##Bathroom painted, access rails installed (Thanks Bill S, Joe L, and Mrs. Joe L)
##Space Upgrades
+
##john brought some safety equipment.
###Bathroom painted, access rails installed (Thanks Bill S, Joe L, and Mrs. Joe L)
 
 
#Upcoming Workshops, Meetings and Events
 
#Upcoming Workshops, Meetings and Events
 
##KYOSS [Kentucky Open Source Society] (3/14 6:30pm)
 
##KYOSS [Kentucky Open Source Society] (3/14 6:30pm)
Line 34: Line 33:
 
##Conglomeration (4/13-4/15)
 
##Conglomeration (4/13-4/15)
 
###http://www.conglomeration.info/
 
###http://www.conglomeration.info/
 +
 
#Project Roll Call
 
#Project Roll Call
 +
##Aaron : found openscad pully library
 +
##John Codder : mathmatic cube model - superglue and baking soda to fill seams
 +
##Patrick : arduino with 27 pad midi controller
 +
 +
20 people

Latest revision as of 19:21, 13 March 2012

STREAMING:

  • Streaming projector screen from meeting: [1]
  • Streaming video/audio of meeting: [2]

Agenda

  1. You can find all of our Meeting Minutes at http://wiki.lvl1.org
  2. Please Sign in on the meeting attendance roster.
  3. Waivers of Liability - Please sign if you have not already
  4. Equipment Wanted
    1. (Wiez)Crucible and investment (> 3000 deg)
    2. (Wiez)propane tank and regulator (old grill anyone?) and atmospheric air tank
    3. (Josh?)Vacuum Pump CFM rating currently undecided.
    4. (Tim/Space)Additional welding masks and welding screens
    5. (Wiez)Graphite sheet 1/8" - 1/4"in (or woven fiberglass / silicon)
    6. (Chris/Brad)Solenoid Valve (>= 150psi)
  5. Open Invitations for LVL1 Contributions (for serious considerations, please put it in writing)
    1. Bernheim CONNECT August 2012 Projects / Planning
    2. Projects / Installations for Louisville Metro
    3. ConGlomeration (4/13-4/15) would like to know if LVL1 would like run a panel this year
      1. See Joe P if you are interested.
    4. Meet Your Maker Series in the Louisville Paper (email Grace S.)
  6. Space Upgrades
    1. Bathroom painted, access rails installed (Thanks Bill S, Joe L, and Mrs. Joe L)
    2. john brought some safety equipment.
  7. Upcoming Workshops, Meetings and Events
    1. KYOSS [Kentucky Open Source Society] (3/14 6:30pm)
    2. Sound Builders (fortnightly Mondays, next 3/19).
    3. LVL1 Open Meeting & Making every Tuesday 8pm
    4. White Star Balloon Meeting (Thurs 8pm)
    5. Pow-Pow-Powerwheels Racing Series meeting (Thurs 9pm)
      1. First Race: June 23-24 Kansas City Makerfaire
    6. Conglomeration (4/13-4/15)
      1. http://www.conglomeration.info/
  1. Project Roll Call
    1. Aaron : found openscad pully library
    2. John Codder : mathmatic cube model - superglue and baking soda to fill seams
    3. Patrick : arduino with 27 pad midi controller

20 people