Difference between revisions of "O&D Meeting 02/15/2022"

From LVL1
Jump to navigation Jump to search
 
(28 intermediate revisions by one other user not shown)
Line 6: Line 6:
  
 
= Minutes =  
 
= Minutes =  
Meeting called to order by Andy @
+
Meeting called to order by Andy @ 9:00 PM
  
 
* Opening statement
 
* Opening statement
* Meeting order
+
* New board introduced
* What can I do for you!
 
  
= Directors =
+
=== Directors ===
 
     President - Andy Miller
 
     President - Andy Miller
 
     Vice President-Tim Miller
 
     Vice President-Tim Miller
Line 22: Line 21:
  
 
=== Absent ===
 
=== Absent ===
 +
None
  
 +
=== Members in Attendance ===
 +
10
 +
 +
 +
 +
= Treasurer's Report =
 +
 +
Current member count is 71 as of tonight. Number of members needed for the budget to be valid is 64.
 +
January Financial snapshot presented:
  
  
=== Members in Attendance ===
+
Income
 +
* Dues - Republic Bank $3150.00
 +
* Dues - PayPal 350.0
 +
* Amazon  0.00
 +
* Cash 66.00
 +
* Total $3,566.00
  
  
 +
Expenses
 +
* CC Processing ($ 120.75)
 +
* Insurance (  138.85)
 +
* Amazon     0.00
 +
* Zoom         (  31.78)
 +
* LG&E         (  405.80)
 +
* Other        (  311.59)
 +
* Rent         (1,500.00)
 +
* Pike13 (  149.00)
 +
* Bank Fee (    2.95)
 +
* Flickr (    6.99)
 +
* PayPal (  10.43)
 +
* Total       ($ 2,678.14)
  
  
 +
NET Increase $ 887.86
  
===Guests===
 
  
 +
* Republic Balance $ 49,715.08
 +
* PayPal Balance  $    33.01
  
== Treasurers Report ==
 
  
 +
* Makership Fund  $  2,620.00 (included in Republic balance above)
 +
* Hat Grant        $    140.41 (included in Republic balance above)
 +
* Emergency Fund  $  9,198.12 (included in Republic balance above)
 +
**  CD 239 $3,061.51
 +
**  CD 190 $3,061.51
 +
**  CD 220 $3,075.10
  
* current treasurer report
 
'''current member count is'''
 
'''Number of members needed for the budget to be valid is 64'''
 
  
== COVID-19 ==
+
= COVID-19 =
 
* Space Report  
 
* Space Report  
 
** Supply report -- supplies good
 
** Supply report -- supplies good
Line 49: Line 80:
 
*Andy Has contacted Wesbanco insurance, spoke to Jimmy Boiling about a quote to amend our current policy to allow Lvl1 to be covered for alcohol-related damage.
 
*Andy Has contacted Wesbanco insurance, spoke to Jimmy Boiling about a quote to amend our current policy to allow Lvl1 to be covered for alcohol-related damage.
  
==Equipment Repairs and report==
+
= Equipment Repairs and report =
  
 
# The hinges have finally arrived and will be dropped off at the space.
 
# The hinges have finally arrived and will be dropped off at the space.
Line 57: Line 88:
  
  
Finished Business The year-end transition has been completed!
+
= Finished Business =
 +
The year-end transition has been completed!
 
• Filed with Secretary of State
 
• Filed with Secretary of State
• President needs set of keys, Treasurer needs keys to safe & lockboxes
+
• President needs set of keys, Treasurer needs keys to safe & lock-boxes
 
• Contact the landlords and inform them of the changeover
 
• Contact the landlords and inform them of the changeover
 
• Change email/username accesses, change forwarding groups
 
• Change email/username accesses, change forwarding groups
 
• Streamline member-adding procedure
 
• Streamline member-adding procedure
  
=Space Improvements=
 
• Andy will reach out to Patrick about his large member storage plan since it just passed, (complete)
 
  
 +
= Space Improvements =
 +
* Andy will reach out to Patrick about his large member storage plan since it just passed, (complete)
 +
* Reachouts to people with stuff/equipment/projects/etc stored longterm in the boneyard welcome, but we will not delay boneyard cleanup for these communication efforts which are in addition to communications through normal LVL1 channels.
 +
* Need to find missing heater for metal shop.
  
  
 
= New Business =
 
= New Business =
 +
* Lexington Design Challenge - additional information received. Andy will forward to board.
 +
* Donation DM4400 CNC Mill - space it requires, and cost to move, physically getting it into the space are concerns. Will request more information.
  
**Lexington Design Challenge
 
**Donation DM4400 CNC Mill
 
 
 
 
 
==Review of events and happenings==
 
  
*we have a February  Makership Candidate!
+
= Review of events and happenings =
*Ben Hosted a highly successful Kincad 6 workshop
+
* We have a February  Makership Candidate!
 +
* Ben Hosted a highly successful Kincad 6 workshop
  
Roundtable
 
  
 
= Close =
 
= Close =
: Meeting was adjourned at 9:55 PM
+
Meeting was adjourned at 9:40 PM.

Latest revision as of 19:48, 3 April 2022




Minutes

Meeting called to order by Andy @ 9:00 PM

  • Opening statement
  • New board introduced

Directors

   President - Andy Miller
   Vice President-Tim Miller
   Secretary-Ann McWilliams
   Treasurer-Tiffany Haynie
   Director-at-large - Bill "Lockadoc" Schwab
   Director-at-large - Raj Shah
   Director-at-large - Charles "The Hat" Lehman

Absent

None

Members in Attendance

10


Treasurer's Report

Current member count is 71 as of tonight. Number of members needed for the budget to be valid is 64. January Financial snapshot presented:


Income

  • Dues - Republic Bank $3150.00
  • Dues - PayPal 350.0
  • Amazon 0.00
  • Cash 66.00
  • Total $3,566.00


Expenses

  • CC Processing ($ 120.75)
  • Insurance ( 138.85)
  • Amazon 0.00
  • Zoom ( 31.78)
  • LG&E ( 405.80)
  • Other ( 311.59)
  • Rent (1,500.00)
  • Pike13 ( 149.00)
  • Bank Fee ( 2.95)
  • Flickr ( 6.99)
  • PayPal ( 10.43)
  • Total ($ 2,678.14)


NET Increase $ 887.86


  • Republic Balance $ 49,715.08
  • PayPal Balance $ 33.01


  • Makership Fund $ 2,620.00 (included in Republic balance above)
  • Hat Grant $ 140.41 (included in Republic balance above)
  • Emergency Fund $ 9,198.12 (included in Republic balance above)
    • CD 239 $3,061.51
    • CD 190 $3,061.51
    • CD 220 $3,075.10


COVID-19

  • Space Report
    • Supply report -- supplies good

Unfinished Business

  • Andy Has contacted Wesbanco insurance, spoke to Jimmy Boiling about a quote to amend our current policy to allow Lvl1 to be covered for alcohol-related damage.

Equipment Repairs and report

  1. The hinges have finally arrived and will be dropped off at the space.
  2. The switch for the shopbot will be here tomorrow
  3. The firmware for BIQU 3d printer
  4. The Plotter is back online. Big shoutout to Tim Miller!


Finished Business

The year-end transition has been completed! • Filed with Secretary of State • President needs set of keys, Treasurer needs keys to safe & lock-boxes • Contact the landlords and inform them of the changeover • Change email/username accesses, change forwarding groups • Streamline member-adding procedure


Space Improvements

  • Andy will reach out to Patrick about his large member storage plan since it just passed, (complete)
  • Reachouts to people with stuff/equipment/projects/etc stored longterm in the boneyard welcome, but we will not delay boneyard cleanup for these communication efforts which are in addition to communications through normal LVL1 channels.
  • Need to find missing heater for metal shop.


New Business

  • Lexington Design Challenge - additional information received. Andy will forward to board.
  • Donation DM4400 CNC Mill - space it requires, and cost to move, physically getting it into the space are concerns. Will request more information.


Review of events and happenings

  • We have a February Makership Candidate!
  • Ben Hosted a highly successful Kincad 6 workshop


Close

Meeting was adjourned at 9:40 PM.