Difference between revisions of "03/27/2012"

From LVL1
Jump to navigation Jump to search
 
(3 intermediate revisions by 2 users not shown)
Line 7: Line 7:
 
###(Wiez) Crucible and investment (> 3000 deg)
 
###(Wiez) Crucible and investment (> 3000 deg)
 
###(Wiez) propane tank and regulator (old grill anyone?) and atmospheric air tank
 
###(Wiez) propane tank and regulator (old grill anyone?) and atmospheric air tank
###(Josh/Ezra?) Vacuum Pump CFM rating currently undecided.
+
###(Tim/Space) Welding screen
###(Tim/Space) Additional welding masks and welding screens
 
 
###(Wiez) Graphite sheet 1/8" - 1/4"in (or woven fiberglass / silicon)
 
###(Wiez) Graphite sheet 1/8" - 1/4"in (or woven fiberglass / silicon)
###(Chris/Brad) Solenoid Valve (>= 150psi)
+
###(space) Real C02 extinguisher for laser cutter
 
##Open Invitations for LVL1 Contributions (for serious considerations, please put it in writing)
 
##Open Invitations for LVL1 Contributions (for serious considerations, please put it in writing)
 
###Bernheim CONNECT August 2012 Projects / Planning
 
###Bernheim CONNECT August 2012 Projects / Planning
 
###Projects / Installations for Louisville Metro
 
###Projects / Installations for Louisville Metro
###ConGlomeration (4/13-4/15)  would like to know if LVL1 would like run a panel this year
 
####See Joe P if you are interested.
 
 
###Meet Your Maker Series in the Louisville Paper (email Grace S.)
 
###Meet Your Maker Series in the Louisville Paper (email Grace S.)
 
#New Business
 
#New Business
Line 21: Line 18:
 
###???
 
###???
 
##Membership vote to enter Fiscal Sponsorship with School Factory
 
##Membership vote to enter Fiscal Sponsorship with School Factory
 +
###vote passed
 +
### 30 people voted out of 42 members in good standing
 +
### 28 voted yes and 2 voted no
 
#Upcoming Workshops, Meetings and Events
 
#Upcoming Workshops, Meetings and Events
 
##Sound Builders (fortnightly Mondays, next 4/2).
 
##Sound Builders (fortnightly Mondays, next 4/2).
Line 26: Line 26:
 
##White Star Balloon Meeting (Thurs 8pm)
 
##White Star Balloon Meeting (Thurs 8pm)
 
##Pow-Pow-Powerwheels Racing Series meeting (Thurs 9pm)  
 
##Pow-Pow-Powerwheels Racing Series meeting (Thurs 9pm)  
###First Race: June 23-24 Kansas City Makerfaire
 
 
##Solar Panel Build (4/7 1-5pm)
 
##Solar Panel Build (4/7 1-5pm)
 
##Conglomeration (4/13-4/15)
 
##Conglomeration (4/13-4/15)
 
###http://www.conglomeration.info/
 
###http://www.conglomeration.info/
 
##Hot and Spicy Fest (5/19 6pm)
 
##Hot and Spicy Fest (5/19 6pm)

Latest revision as of 20:45, 27 March 2012

Agenda

  1. You can find all of our Meeting Minutes at http://wiki.lvl1.org
  2. Please Sign in on the meeting attendance roster.
  3. Waivers of Liability - Please sign if you have not already
  4. Old Business
    1. Equipment Wanted
      1. (Wiez) Crucible and investment (> 3000 deg)
      2. (Wiez) propane tank and regulator (old grill anyone?) and atmospheric air tank
      3. (Tim/Space) Welding screen
      4. (Wiez) Graphite sheet 1/8" - 1/4"in (or woven fiberglass / silicon)
      5. (space) Real C02 extinguisher for laser cutter
    2. Open Invitations for LVL1 Contributions (for serious considerations, please put it in writing)
      1. Bernheim CONNECT August 2012 Projects / Planning
      2. Projects / Installations for Louisville Metro
      3. Meet Your Maker Series in the Louisville Paper (email Grace S.)
  5. New Business
    1. Space Upgrades
      1. ???
    2. Membership vote to enter Fiscal Sponsorship with School Factory
      1. vote passed
      2. 30 people voted out of 42 members in good standing
      3. 28 voted yes and 2 voted no
  6. Upcoming Workshops, Meetings and Events
    1. Sound Builders (fortnightly Mondays, next 4/2).
    2. LVL1 Open Meeting & Making every Tuesday 8pm
    3. White Star Balloon Meeting (Thurs 8pm)
    4. Pow-Pow-Powerwheels Racing Series meeting (Thurs 9pm)
    5. Solar Panel Build (4/7 1-5pm)
    6. Conglomeration (4/13-4/15)
      1. http://www.conglomeration.info/
    7. Hot and Spicy Fest (5/19 6pm)