ShopBot Pre-Job Tasklist
Overview
Use this list to safely and properly use the ShopBot. You can click through links to view more detailed instructions and resources.
Note: a physical copy of this checklist is available on the ShopBot work desk.
Checklist
| Task | Photo |
|---|---|
| Complete VCarve Checklist | |
| Power on control box | |
| Home X,Y Axis | |
| Check chuck is secure | |
| Run spindle warm-up routine | |
| Install mill bit in chuck. Monkey tight. | |
| Position mill bit to origin (set in VCarve) (unless using absolute positioning For more, see ShopBot Bit Positioning |
|
| Home Z Axis. | |
| Ensure Z homing plate and alligator clips are returned to holder | |
| (OPTIONAL) Use Keypad Quick Positions to memorize toolchange and job location | |
| Ensure sane Safe Z Height (Cutter Values > Set safe Z height) | |
| Ensure tool will not hit screws or other objects securing material. For more, see Securing ShopBot Material |
|
| (OPTIONAL) Ensure system log is enabled for suspend/resume. | |
| Attach dust collector boot. | |
| Open dust collector valve. Close other dust collector valves. | |
| Turn dust collector on. | |
| Load file, and click run. |