ShopBot Pre-Job Tasklist
Jump to navigation
Jump to search
Overview
Use this list to safely and properly use the ShopBot. You can click through links to view more detailed instructions and resources.
Note: a physical copy of this checklist is available on the ShopBot work desk.
Checklist
| Task | Photo |
|---|---|
| Complete VCarve Checklist | |
| Power on control box | |
| Home X,Y Axis | |
| Check chuck is secure | |
| Run spindle warm-up routine | |
| Install mill bit in chuck. Monkey tight. | |
| Position mill bit to origin (set in VCarve) (unless using absolute positioning For more, see ShopBot Bit Positioning |
|
| Home Z Axis. | |
| Ensure Z homing plate and alligator clips are returned to holder | |
| (OPTIONAL) Use Keypad Quick Positions to memorize toolchange and job location | |
| Ensure sane Safe Z Height (Cutter Values > Set safe Z height) | |
| Ensure tool will not hit screws or other objects securing material. For more, see Securing ShopBot Material |
|
| (OPTIONAL) Ensure system log is enabled for suspend/resume. | |
| Attach dust collector boot. | |
| Open dust collector valve. Close other dust collector valves. | |
| Turn dust collector on. | |
| Load file, and click run. |