01/22/2013: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 17: | Line 17: | ||
*(Eric [Makership]) Laser distance sensors | *(Eric [Makership]) Laser distance sensors | ||
*(Lindsay [Makership]) Pinball Machine (any condition, will be redesigned) | *(Lindsay [Makership]) Pinball Machine (any condition, will be redesigned) | ||
*(Michael D. [UofL Makership]) Projector with AV input | |||
= Space Upgrades = | = Space Upgrades = | ||
Revision as of 12:57, 22 January 2013
First time Visitor Info
- PARK ONLY IN THE ORI LOT OR ON THE STREET
- If you park in our neighbors private lot, they will block you in for fun.
- Waivers of Liability - Please sign if you have not already
- Our website / calendar is http://www.lvl1.org
- Sign up for our Google Group discussion list
- You can find all of our Meeting Minutes at http://wiki.lvl1.org
Equipment and Supplies Wanted
- (Gerrit) Roomba parts for building the cleaning robot army.
- (Ron - Muddy Tech) Computers P4 or higher and LCD Monitors
- (John) 10hp Engine vertical shaft
- (Ben) 220 30amp switch for stick welder
- (Cody) Red Flyer Wagon
- (Devin)original NES connector
- (Eric [Makership]) Laser distance sensors
- (Lindsay [Makership]) Pinball Machine (any condition, will be redesigned)
- (Michael D. [UofL Makership]) Projector with AV input
Space Upgrades
- New Printer (B&W Only) (Thanks Aaron!)
- IP is 10.0.0.251
Space Downgrades
- Laser cutter motor controller exploded (UPDATE: Damaged Board is on the way to us 1/17)
Regular Meetups
- Sound Builders (fortnightly Mondays, next 2/4 8pm)
- LVL1 Open Meeting & Making every (Tuesday 8pm)
- Muddytech Computer training (upstairs Thurs 6pm) Looking for students
- Muddytech SIG every 3rd Wednesday
- Game Dev Group (Sat 12pm)
- MakerEd Louisville (First Wed of the Month next 2/6 7pm)
- KYOSS Monthly Meeting (2nd Wed of the Month 2/13 6:30pm)
- Friday Irregular Movie and Open Build Night (Friday ~7pm)
Upcoming Workshops and Events
- Start-Up Weekend Louisville (March 1-3)
- 3D Printer Build-off 3/10
- Workshop signups are closed.
5 Minute Maintenance and Cleaning
- List on the whiteboard