Difference between revisions of "01/01/2013"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
= Equipment and Supplies Wanted = | = Equipment and Supplies Wanted = | ||
− | |||
*(Gerrit) [[Req-Roomba|Roomba]] parts for building the cleaning robot army. | *(Gerrit) [[Req-Roomba|Roomba]] parts for building the cleaning robot army. | ||
*(Ron - Muddy Tech) Computers P4 or higher and LCD Monitors | *(Ron - Muddy Tech) Computers P4 or higher and LCD Monitors | ||
Line 52: | Line 51: | ||
*** Treasurer - Tim M, ??? | *** Treasurer - Tim M, ??? | ||
*** Secretary - Aaron V, ??? | *** Secretary - Aaron V, ??? | ||
− | *** Directors-at-Large - Raj S, Nathan A, ??? (Need 3) | + | *** Directors-at-Large - Raj S, Nathan A, Jose C, ??? (Need 3) |
* Start-Up Weekend Louisville (March 1-3) | * Start-Up Weekend Louisville (March 1-3) | ||
** http://louisville.startupweekend.org/ | ** http://louisville.startupweekend.org/ |
Revision as of 19:29, 1 January 2013
Contents
First time Visitor Info
- PARK ONLY IN THE ORI LOT OR ON THE STREET
- If you park in our neighbors private lot, they will block you in for fun.
- Waivers of Liability - Please sign if you have not already
- Our website / calendar is http://www.lvl1.org
- Sign up for our Google Group discussion list
- You can find all of our Meeting Minutes at http://wiki.lvl1.org
Equipment and Supplies Wanted
- (Gerrit) Roomba parts for building the cleaning robot army.
- (Ron - Muddy Tech) Computers P4 or higher and LCD Monitors
- (John) 10hp Engine vertical shaft
- (Gerrit) Punching Bag for training the cleaning robot army
- (Ben) 220 30amp switch for stick welder
- (Brian) compression load cell 1000lb
- (Devin)1366x768 monitor and low profile graphics card PCI-E
- (Devin) Gas weed trimmer
- (Ian) smoke machine
- (Tim M) full size dishwasher (for the kitchen)
- (Gerrit) additional copies HALO 1, 2 and Reach
- (Cody) Red Flyer Wagon
Space Upgrades
- New Table Saw
- Boneyard purged
Space Downgrades
- Laser cutter motor controller exploded (repair pending)
Regular Meetups
- Sound Builders (fortnightly Mondays, next 1/7 8pm)
- LVL1 Open Meeting & Making every (Tuesday 8pm)
- The Rocketeers (Wed 8pm)
- Final meeting tomorrow, Jan 2. (Android rocket complete!)
- Will resume in late Spring with possible launches.
- Muddytech Computer training (upstairs Thurs 6pm) Looking for students
- Muddytech SIG every 3rd Wednesday
- Game Dev Group (Sat 12pm)
- KYOSS Monthly Meeting (2nd Wed of the Month 1/6 6:30pm)
- Friday Irregular Movie and Open Build Night (Friday if someone shows up ~7pm)
Upcoming Workshops and Events
- PHP Code Igniter Workshop (1/5 12pm)
- Officer and Director Election (1/15)
- Last day of nominations is 1/8
- Current nominations
- President - Brad L, ???
- Vice President - Jose C, Josh W, ???
- Treasurer - Tim M, ???
- Secretary - Aaron V, ???
- Directors-at-Large - Raj S, Nathan A, Jose C, ??? (Need 3)
- Start-Up Weekend Louisville (March 1-3)
5 Minute Maintenance and Cleaning
- List on the whiteboard