Difference between revisions of "08/21/2012"

From LVL1
Jump to navigation Jump to search
Line 11: Line 11:
 
*(Tim M/Jon C/Joe P) Numerous Propane tanks ~20-40lb with inspection or newer than 10 years(pass fire marshal check)
 
*(Tim M/Jon C/Joe P) Numerous Propane tanks ~20-40lb with inspection or newer than 10 years(pass fire marshal check)
 
*(Brad) Furby
 
*(Brad) Furby
 +
*(Aaron) Boxes of network cable and RJ45 ends for stack of switches on table.
  
 
== Space Upgrades ==
 
== Space Upgrades ==
 
* Makerbot Replicator reloaded with filament
 
* Makerbot Replicator reloaded with filament
 +
* Rackmount console in server rack (monitor, keyboard and mouse in a 1U drawer)
  
 
== Open Invitations for LVL1 Contributions ==
 
== Open Invitations for LVL1 Contributions ==

Revision as of 19:53, 21 August 2012

Agenda

First time Visitor Info

Equipment and Supplies Wanted

  • (Tim M) Liquid Nitrogen Dewar transport/store
  • (Tim M/Jon C/Joe P) Numerous Propane tanks ~20-40lb with inspection or newer than 10 years(pass fire marshal check)
  • (Brad) Furby
  • (Aaron) Boxes of network cable and RJ45 ends for stack of switches on table.

Space Upgrades

  • Makerbot Replicator reloaded with filament
  • Rackmount console in server rack (monitor, keyboard and mouse in a 1U drawer)

Open Invitations for LVL1 Contributions

  • Bernheim CONNECT 2012 (Aug 25)
    • Hopefully we already know if you are contributing something by now
    • WHAS Great Day Live morning show on Thursday; small projects that could go in studio?

Regular Meetups

  • Sound Builders (fortnightly Mondays, next 9/6 8pm).
  • LVL1 Open Meeting & Making every (Tuesday 8pm)
  • The Rocketeers (Wed 8pm)
  • Muddytech Computer training (upstairs Thurs 6pm) Looking for students

Upcoming Workshops and Events

Project Roll Call