Difference between revisions of "Makership Kart Build"
Line 3: | Line 3: | ||
+ | = Day 0 Friday July 8= | ||
+ | Arrived at space with makership approved, plan to start fabricating frame for kart. Cut side frame rails: 4'2" long 1.5" diameter steel tubing. Found 2.5" tube for the back rail and a 1.575" tube for the front rail. Got sidetracked building battleship frame | ||
− | |||
− | |||
− | |||
+ | = Day 1 Saturday July 9= | ||
+ | began welding frame using a tubeular [http://www.blocklayer.com/pipe-notchingeng.aspx template generator] to notch out the metal. Basic rectangular frame finished. | ||
− | = Day | + | |
− | + | = Day 2 Sunday July 10= | |
− | + | Went to a [http://isapickpullsave.com/part-list/ junkyard] and salvaged the steering system out of a lawn tractor. Also went to Harbor freight and bought 2 [http://www.harborfreight.com/heavy-duty-10-inch-groove-tread-tire-40729.html 10" wheels] with 5/8" ball bearings | |
+ | |||
+ | |||
+ | = Day 3 Monday July 11= | ||
+ | Removed 5/8" ball bearings from wheels to make room for either 3/4" bearings or solid hub for power transmission. |
Revision as of 15:20, 13 July 2016
Contents
Plan
the goal of this project is to build a gas powered go-kart that can compete in the KYSCCA autocross events at the L-Ville convention center.
Day 0 Friday July 8
Arrived at space with makership approved, plan to start fabricating frame for kart. Cut side frame rails: 4'2" long 1.5" diameter steel tubing. Found 2.5" tube for the back rail and a 1.575" tube for the front rail. Got sidetracked building battleship frame
Day 1 Saturday July 9
began welding frame using a tubeular template generator to notch out the metal. Basic rectangular frame finished.
Day 2 Sunday July 10
Went to a junkyard and salvaged the steering system out of a lawn tractor. Also went to Harbor freight and bought 2 10" wheels with 5/8" ball bearings
Day 3 Monday July 11
Removed 5/8" ball bearings from wheels to make room for either 3/4" bearings or solid hub for power transmission.