Difference between revisions of "08/21/2012"

From LVL1
Jump to navigation Jump to search
Line 18: Line 18:
 
*Bernheim CONNECT 2012 (Aug 25)
 
*Bernheim CONNECT 2012 (Aug 25)
 
**Hopefully we already know if you are contributing something by now
 
**Hopefully we already know if you are contributing something by now
**WHAS wants us on their Great Day Live morning show on Thursday for people with projects ready. Let me know if you want to do it.
+
**WHAS Great Day Live morning show on Thursday; small projects that could go in studio?
  
 
== Regular Meetups ==
 
== Regular Meetups ==

Revision as of 19:40, 21 August 2012

Agenda

First time Visitor Info

Equipment and Supplies Wanted

  • (Tim M) Liquid Nitrogen Dewar transport/store
  • (Tim M/Jon C/Joe P) Numerous Propane tanks ~20-40lb with inspection or newer than 10 years(pass fire marshal check)
  • (Brad) Furby

Space Upgrades

  • Makerbot Replicator reloaded with filament

Open Invitations for LVL1 Contributions

  • Bernheim CONNECT 2012 (Aug 25)
    • Hopefully we already know if you are contributing something by now
    • WHAS Great Day Live morning show on Thursday; small projects that could go in studio?

Regular Meetups

  • Sound Builders (fortnightly Mondays, next 9/6 8pm).
  • LVL1 Open Meeting & Making every (Tuesday 8pm)
  • The Rocketeers (Wed 8pm)
  • Muddytech Computer training (upstairs Thurs 6pm) Looking for students

Upcoming Workshops and Events

Project Roll Call